ENR Magazine featured a crane project built by CCH at a military base is Colorado. This project required us to build a 35 ton 102’span top running double girder crane in a hanger that has an entire side of the building retract for vehicle access. The project took 3 years to build from initial conceptual design to commissioning. We are very proud to be featured for this project.